Sandy Disaster Relief Grants

SANDY DISASTER RELIEF GRANTS

Christ Church has received two grants for the purposes of repair and resiliency work on its two historic sites both as a result of Superstorm Sandy and to protect against future such storms. The grant amounts for both the Church building and graveyard and the Rectory total about $350,000

Support for this project was provided by a Sandy Disaster Relief Grant for Historic Properties provided by the Historic Preservation Fund of the National Park Service to the New Jersey State Historic Preservation Office, awarded by the New Jersey Historic Trust.

These grants were awarded in early 2015 and much has occurred since that date. Much of the early work has been oriented toward a detailed understanding of the specific work to be undertaken.

A thorough Condition Assessment of the Church and the Rectory were undertaken by Westfield Associates of Haddon Heights, NJ. The resultant documents provided a complete understanding of the condition of the historic structures and formed the basis for a bid process to select a general contractor to undertake the work. The condition assessment also included the creation of construction documents as part of the bid process to guide the selected contractor in performing the work according to established historic site construction principles. This bid process is currently underway with contractors for the two sites to be selected in early November.

There also was a Condition Assessment performed on all of the gravemarkers in the churchyard. This work was performed by Schnabel Conservation L.L.C. of Trenton NJ. This Assessment included photographs of each gravestone with a description of each marker’s current condition. This information was integrated into the church’s graveyard database. Here is an example of this work.

sandy-graveyard-spreadsheet

This records the condition of a brown sandstone gravemarker recording the death of Joseph Tole, nineteen years old at his death in 1781.

This gravemarker assessment work also included more detailed guidance on repair work to be performed on markers in most critical need of restoration. In a bid process Jablonski Building Conservation of New York City was selected to perform the restoration work on an initial set of thirteen gravemarkers.

The gravestone restoration work supported by the SDRG grant is now complete. The original plan to address 13 gravemarkers was expanded by one marker due to savings on work on the first group. The one added was that of Christina Hageman, who died at the age of two in 1785 and was marked by a brownstone. Christina’s gravemarker was in many pieces and was both reconstructed and moved near where the walkway approaches the Memorial Garden.

This is a list of the restored gravemarkers.

  1. Marker 601 Joseph Tole  1762-1781
  2. Marker 316 Sarah Throckmorton   1659-1743
  3. Marker 428 Margaret Throckmorton  1765-1817
  4. Marker 331 Hartness Throckmorton  1735-1760
  5. Marker 490 Elizabeth Vaughton   1715-1800
  6. Marker 491 Mary Wessells   1728-1816
  7. Marker 494 Susannah De Haert   1724-1780
  8. Marker 502 Mary Leonard   1716-1782
  9. Marker 731 Zilpha Halstead   1723-1754
  10. Marker 366 Hendrick Pool 1798-1818
  11. Marker 392 Mary Slocum 1734-1809
  12. Marker 717 John Hart 1759-1805
  13. Marker 701 Clara Wheeler 1782-1855
  14. Marker 866 Christina Hageman 1781-1784

graveyard-11-2016

Lorraine Schnabel and Stephanie Hoagland-Bond with newly restored gravemarker of Zilpha Halstead.

Some additional work has been completed under the grant’s auspices. One is the repair of the 1874 E Howard clock and bell control mechanism. Some of the parts of this complex mechanism were repaired by Stevenson Services of Bristol CT.

The clock faces have been synchronized and the clock timing adjusted for accuracy.

sandy-clock-pic

In addition one of the aspects of protecting the Church and Rectory buildings is careful control of tree growth. Both sites have considerable mature trees. These trees were trimmed with deadwood removed. A dead 100 foot tulip tree was removed. This work was performed by Becker’s Tree Service of Tinton Falls, NJ.

sandy-tree-pic

SDRG WORK PROGRESSES

SDRG work has continued at both the Church and Rectory, mostly performed by the Masonry Preservation Group. At the Church this has included repairing the cupola louvers, replacing the bulkhead doors, and restoring the front steps. At the Rectory, this has included implementing a new CMU wall in the basement for stability and installing steel posts with cement footing. Further work on the Rectory exterior has begun with shutter removal. These will be restored at the MPG woodworking shop. Further on-site work will resume in the warm weather.

Shutters being removed

Shutters being removed

New bulkhead doors

New bulkhead doors

New CMU wall in rectory

New (black) support column

New (black) support column

Church front steps

Church front steps

WORK CONTINUES ON THE RECTORY

Work progresses on the Rectory. Scaffolding is up and the building is being powerwashed.

rectory1a

 rectory1  rectory3

Rectory work extends to cornice repair and painting. The color is terra cotta.

rectory4 rectory5